Projects

Oil & Gas Projects

AGOL LPG Phase 1A&B

Development of a 20,000MT Bulk LPG Import, Storage and Handling Terminal.

More Details

AGOL LPG Phase 1C

Installation of an additional 5000MT Bulk LPG Storage and Handling facility.

More Details

Petroda Mazambique

Design & Construction Management of a 72 Million liter white oils import,export and distribution Terminal.

More Details

Agol Pipeline Project

Proposed 12" Redundant Import Pipeline & Rehabilitation of Existing Pipeline.

More Details

Gas Petro Pipeline

Construction of a proposed 200 NB 8”Dia Dual Pipeline of 1.9Km Length

More Details

PROTO Bottling Plant

Proto Bottling facility targeting.

More Details

Total Nyali Links

Development of a three-tier service station that would serve customers along a major travel route.

More Details

Shell Kerarapon

Development of a tier 3 Shell roadside service station.

More Details

Geosynthetics Projects

AGOL Slope Protection

Analysis, design and installation of slope stabilization, surface protection and grassing.

More Details

AGOL Zone E

Construction of a Reinforced Soil Structure (RSS) for stabilization and protection of the slope adjacent to the loading gantry ofthe LPG storage facility.

More Details

AGOL Slope Protection

Construction of a 5-tiered structure for thestabilization of the slope along the Eastern boundary of the LPG facility.

More Details